Energy Efficient & Production Shops Energy Reduction Projects

  

Energy Efficient & Production Shops Energy Reduction Projects

Absher Construction

Naval Base Kitsap, Bremerton, WA

1,076,637 sf

This project consists of work on several buildings ranging from Energy Efficiency Improvements to Seismic Upgrades to Full Demolition. The project is proposed to be divided into (3) separate groups that focus on the varying types of work on multiple buildings throughout the shipyard. The Separate Groups and the buildings planned for work in each of those groups are as follows:

• Group 1 - SHPO & Energy Efficiency Improvements buildings 147, 460 & 427 .

• Group 2 – Energy Efficiency Improvements and Retro-Commissioning Buildings: 455, 480 & 457

• Group 3 Energy Efficiency Improvements for Bldgs 857 and 850 and Demolition Buildings: 523,500, 480 & 461

©2011-2017 BCRA, Inc.  All Rights Reserved.