JOSHUA W. SOTO PHYSICAL FITNESS FACILITY
FORT BLISS, TEXAS
COMPLETED
2010
CONSTRUCTION COST
$19.5 Million
SIZE
90,094 Square Feet
BCRA SERVICES PROVIDED
Architecture
   Sustainable Design
Engineering
   Civil Engineering
   Structural Engineering
Interior Design
Forensic Investigation
 © 2005 BCRA